One Stop Shop: Steel Pipes, Fittings, Flanges, and Coating


Release time:

2026-04-13

Ourcing from multiple suppliers is slow and risky. Different lead times, inconsistent quality, and extra freight costs all add up.

Ourcing from multiple suppliers is slow and risky. Different lead times, inconsistent quality, and extra freight costs all add up. We offer a simpler way. We supply not only seamless and welded pipes but also the complementary products you need for a complete pipeline system.

What we can provide from one purchase order

First, steel pipes in all common grades and sizes. Seamless from 1/2 inch to 36 inch. Welded ERW from 1/2 inch to 24 inch. LSAW from 20 inch to 80 inch. Grades include ASTM A106 Gr.B, A53 Gr.B, API 5L Gr.B through X70, and ST52.

Second, pipe fittings. Elbows (45, 90, 180 degrees), tees (equal and reducing), reducers (concentric and eccentric), caps, and bends. Materials match pipe grades. Butt weld and threaded types available.

Third, flanges. Slip on, weld neck, blind, threaded, and lap joint flanges in class 150 to 2500. Face types: flat face, raised face, and ring joint. Carbon steel and stainless steel.

Fourth, coating and lining. Fusion bonded epoxy (FBE), three layer polyethylene (3LPE), three layer polypropylene (3LPP), and internal epoxy coating for drinking water or oil services. We work with certified coating mills.

Why consolidate your bill of materials with us

When you buy everything from one supplier, you save on freight because we consolidate multiple items into one container. You save on inspection because one third party visit covers all products. You save on documentation because you receive one set of shipping papers and one commercial invoice. And you avoid mismatches between fittings and pipes because we control all dimensions from the same standards.

We also offer basic fabrication

Cut to length. Bevel ends for welding. Threaded ends. Grooved ends. Drill bolt holes on flanges. Apply rust preventive oil or varnish. Heat treatment for high pressure applications. Tell us your end preparation requirements and we include them in the quote.

Typical bundled orders we handle

Project example A: 500 meters of API 5L X52 seamless pipe, plus 40 elbows, 20 tees, 15 reducers, and 60 slip on flanges. All coated with 3LPE. Shipped to Jebel Ali port. One PO. One delivery.

Project example B: 2000 meters of ASTM A106 Gr.B seamless pipe with beveled ends, plus internal epoxy lining. No fittings required. Shipped to Houston. One PO. One delivery.

How to place a bundled order

Step 1: Send us your complete material takeoff list. Include pipe sizes, grades, lengths, fitting types and quantities, flange classes and sizes, and any coating specifications.

Step 2: We check all items and reply with a consolidated quote including total weight, estimated container count, and delivery timeline.

Step 3: You confirm and we issue a proforma invoice. We then source or produce each item. You are welcome to arrange third party inspection for the full package.

Step 4: We pack, consolidate, load, and ship. All items on one bill of lading.

Save time and reduce risk

Managing five suppliers for one project is stressful. One supplier is simple. Let us be that one supplier.

Contact Shandong Lianfeng Chuangye Materials Co., Ltd. with your material list. We will quote the full package. No obligation. Just a faster, easier way to buy steel products.

Latest News

One Stop Shop: Steel Pipes, Fittings, Flanges, and Coating

Ourcing from multiple suppliers is slow and risky. Different lead times, inconsistent quality, and extra freight costs all add up.

2026-04-13

We Welcome SGS, BV, or TÜV Inspections. Here is Why.

When you order from us, you are welcome to bring any third party inspection agency such as SGS, Bureau Veritas, or TÜV to our facility.

2026-03-03

Need Steel Pipes Fast? We Keep Thousands of Tons Ready to Ship.

Project deadlines don't wait. When your pipeline, structural, or pressure application needs steel pipes urgently, waiting weeks for mill production is not an option.

2026-02-20

99.9% Defect-Free: What Our Digital Testing Means for Your Pipeline Project

A single undetected pipe defect can shut down a project for days. Rework costs mount. Schedules slip. And trust erodes.

2026-02-05

CE-PED, API 5L, and Beyond: How We Take the Compliance Burden Off Your Shoulders

Every international buyer knows the feeling: a project is ready to go, but the pipe certifications don’t match the destination’s requirements. Delays happen.

2026-01-12

Apply For Discount !

24 Hours Online Service

Provide You With Free Industry Solutions

Quality Assurance

%{tishi_zhanwei}%